The stamp fascia hanger gets directly mounted to the fascia board.
To install simply place the gutter inside the fascia hangers, then fold the back tab down inside the gutter, finally fold the front tab up and around the front bead of the gutter.
Recommended spacing varies depending on geographical location. Standard spacing is every 24 inches, however heavy snow fall areas may require spacing to be every 18 inches.